Details
June 4, 2020
10:45AM - 11:45AM
New Greenfield Site Environmental Permitting: So You Have a Site Selected, Now What Do You Do?
Kyle Hagen, Sr. Project Manager, Sage ATC Environmental Consulting
Floral A1
This session will cover the requirements for creating and/or integrating the spill response and prevention plans that include the Spill, Prevention, Control, and Countermeasures (SPCC) Plan, the Oil Spill Contingency Plan (OSCP), the Storm Water Pollution Prevention Plan (SWPPP), and the Groundwater Protection Plan (GPP). Participants will gain a basic understanding of the EPA, Texas, and Louisiana requirements for spill response and prevention plan development and how best to integrate these plans.
Add to Calendar
aCLuDhaqizCaPxAftmqF167204
06/04/2020 10:45 AM
06/04/2020 11:45 AM
false
New Greenfield Site Environmental Permitting: So You Have a Site Selected, Now What Do You Do?
This session will cover the requirements for creating and/or integrating the spill response and prevention plans that include the Spill, Prevention, Control, and Countermeasures (SPCC) Plan, the Oil Spill Contingency Plan (OSCP), the Storm Water Pollution Prevention Plan (SWPPP), and the Groundwater Protection Plan (GPP). Participants will gain a basic understanding of the EPA, Texas, and Louisiana requirements for spill response and prevention plan development and how best to integrate these plans.
Floral A1